Excavation Calculation Dumps
Excavation and embankment, better known by the people is Cut and Fill field where jobs are very important both in the work of making roads, dams, buildings, and reclamation. Dig and pile can be obtained from map situation that comes with contour lines or obtained directly from yard carpenter's level by measuring the transverse profile along the corridor lines or building project. Excavation and pile can be obtained from the situation with the map depiction methods transverse profile along the path of the project or the method of grids (griding) reviewing excavation and embankment of a top view and calculates the difference in height to the height of the contour line of intersection of contour lines in place projects with a project outline. Cubic feet, cubic yards and cubic meter used in a matter of surveying, although the cubic yard is the most common unit in the ground work 1yd³ = 27 ft³, 1 m³ = 35.315 ft³. However the Indonesian usually used cubic meter as a unit in determin